
The customer needed a 26 kW Generac elevated generator with a 400A ATS, but the installation required extensive trenching through existing landscaping while minimizing disruption to the property. The project also involved City of Bellaire permits, HOA approvals, and utility coordination.
DM Electrical and Construction handled the project turnkey from permitting through final activation. The installation included 90 feet of plumbing and 53 feet of electrical, much of it carefully hand-trenched to protect the customer’s landscaping.
Our team removed and preserved rocks and pavers, installed the underground systems with proper bonding, grounding, and waterproofing, then restored the property to its original condition after inspections were completed.
The result was a clean, code-compliant generator installation completed with precision, reliability, and attention to detail.